hippodrome du
chateau de versailles

France

The Château de Versailles racecourse is not a permanent structure, but an innovative ephemeral installation created especially for the Paris 2024 Olympic and Paralympic Games. It has been set up at the Étoile Royale, in the grounds of the Château, in the immediate vicinity of the Grand Canal.

THE PROJECT :

Hippodrome

THE WORK :

Expert appraisal and various works at the Hippordrome du Chateau de Versailles, France, for the 2024 Olympic Games

DETAILS:

CUSTOMER: COJO

Project
context

the chateau de versailles racecourse, ephemeral infrastructure for the 2024 olympics

The Château de Versailles racecourse, erected for the Paris 2024 Olympic Games, is an exceptional ephemeral installation nestled in the royal park, at the Étoile royale and bordering the Grand Canal. Designed to combine heritage enhancement and top-level equestrian sports, this 8,250 m² arena, surrounded by U-shaped stands accommodating up to 16,000 spectators, is the stage for dressage, show jumping and eventing competitions.

The cross-country course, meanwhile, stretches across the estate, with footbridges crossing the Grand Canal and a capacity of around 40,000 spectators. Based on a powerful dialogue between the art of dressage born at Versailles and the modernity of Olympic sport, the racecourse embodies the fusion of history, innovation and spectacle: a fleeting but memorable interlude, a promise to combine equestrian excellence and heritage majesty.

Work
carried out

our equestrian expertise for the 2024 olympics

years
of experience
0

worldwide
+ 0
country
+ 0
offices
permanent
0

Other projects
equestrian surfaces

Gregori International renovates and manufactures technical floors, even in the most remote places on the planet, for all types of surfaces, open or not, for permanent or temporary use: equestrian arenas and riding arenas, paddocks, walkers, longe rings, Havrincourt rings, trotting tracks, gallop tracks, racecourses, polo fields, etc.

Discover the project
Al Ain Racing Shooting Club

Al Ain Racing Shooting Club

United Arab Emirates
Gregori International has built the Al Ain Racing Shooting Club racetrack in the United Arab Emirates.
Discover the project
Gregori International a réalisé la construction clés en main de la piste de course du Haras de Maury, à Toulouse, avec la technique FiberSoil.

Haras de Maury

France
Gregori International has completed the turnkey construction of the race track at the Haras de Maury in Toulouse, using FiberSoil technology.
Discover the project
Gregori International a réalisé la construction de du Centre Polo et Equestre de Ghantoot, à Abu Dhabi, en 1998 et 1994

Ghantoot Polo and Equestrian Center

United Arab Emirates
Gregori International built the Ghantoot Polo and Equestrian Center in Abu Dhabi in 1998 and 1994.
Discover the project
Hippodrome de Pont Long

Pont-Long racecourse

France
Gregori International built the Pont-Long racecourse in Pau, France, using FAST TRACK technology.