Sports fields Bahir Dar Stadium
Description
Gregori International assure la construction du Stade de Bahir Dar et de ses deux annexes, répondant aux standards de la FIFA.
Company activity
- Stripping of existing substrate and storage on site, Earthworks down to subgrade and slope;
- Reslope the existing drainage layer (remove geotextile) , Deep drainage network (central and peripheral) ;
- Placement of a “closure” layer over the existing drainage layer , Placement of a gravel drainage layer ;
- Creation of an automatic sprinkler system with 35 sprinklers and programming (tapping into existing HDPE at the edge of the plot);
- Pump unit installation ;
- Improvement and replacement of stored substrate with sand, Installation of earth/sand substrate;
- Installation of sports equipment.
- Sodding and growth monitoring 3 months