loader image

Sports fields Bahir Dar Stadium

Description

Gregori International assure la construction du Stade de Bahir Dar et de ses deux annexes, répondant aux standards de la FIFA.

Company activity

  • Stripping of existing substrate and storage on site, Earthworks down to subgrade and slope;
  • Reslope the existing drainage layer (remove geotextile) , Deep drainage network (central and peripheral) ;
  • Placement of a “closure” layer over the existing drainage layer , Placement of a gravel drainage layer ;
  • Creation of an automatic sprinkler system with 35 sprinklers and programming (tapping into existing HDPE at the edge of the plot);
  • Pump unit installation ;
  • Improvement and replacement of stored substrate with sand, Installation of earth/sand substrate;
  • Installation of sports equipment.
  • Sodding and growth monitoring 3 months