loader image

Golf courses Lowlands Golf Course

Description

Extensive engineering studies were the starting point for a series of storage lakes aimed at preserving the limited water resources on this island. This project required full co-operation between all the contractors involved in the construction of this 300 hectare real estate development.

Company activity

18-Holes Championship Golf Course construction + 9 Holes

Works duration: 12 months
Engineering, excavation, waterproofing of 7 inter-linked lakes (storage capacity of 300 000 m3)

Details

Architect: PGA Golf Design
Completion date: 1999